| Dates: | April 13, 2027 |
|---|---|
| Meets: | Tu from 8:00 AM to 5:00 PM |
| Location: | Austin Area Urban League |
| Cost: | $495.00 |
There are still openings remaining at this time.
INSPECTING DRAINAGE, EXCAVATION, AND BACKFILL
Drainage
Excavation and Backfill
- Learn Inspection techniques used in the construction of a Roadway Drainage System.
- Analyze Contract Documents pertaining to Drainage / Excavation and Backfill.
- Develop an understanding of basic Roadway Drainage Systems design.
- Learn the Materials and Test Methods used in shaping, bedding, and backfilling Drainage Structures.
- Identify construction placement specifications for Pre-Cast Drainage System components.
- Develop and demonstrate an understanding of the types and capabilities of equipment used in the construction of a Roadway Drainage System.
- Research Material Specifications and Producers List information for Pre-Cast Structures used in Roadway Drainage Systems.
- Develop and demonstrate Inspection Documentation techniques used for Drainage / Excavation and Backfilling.
- Learn Measurement and Payment techniques used for Drainage / Excavation and Backfill construction.
- Learn basic Safety and Environmental expectations typically utilized during Drainage / Excavation and Backfilling construction operations.
Return to the Main Workshop Page: https://web-ded.uta.edu/wconnect/ShowSchedule.awp1?&Mode=GROUP&Group=pwiari
| Fee: | $495.00 |
|---|---|
| Hours: | 8.00 |
Austin Area Urban League
8011A Cameron Road #A100Austin, TX 78754
eric_valentine@aaul.org
512-478-7176